Low voltage wiring in new construction covers the network, TV, security, camera, doorbell, speaker, and shade wiring that runs at low voltage, separate from the house’s regular electrical. It should be planned before drywall, during the rough-in stage, so cables, conduit, and boxes go in while the walls are open. Plan a central spot where everything comes together, run network cable to every place you’ll want a reliable connection, and add empty conduit for whatever comes next.
The cost of skipping low voltage wiring in new construction is easy to predict. Wi-Fi that doesn’t reach the back bedroom, a TV with cords hanging down the wall, cameras that need an outlet you don’t have. Running wire after drywall means holes, patches, and paint, and some runs just aren’t practical once the house is closed up.
What is low voltage wiring in new construction?
It’s the communication and control wiring for the house. Common items include:
Network cable. Wired internet to TVs, offices, access points, and game consoles.
Coax. For cable TV or antenna service, if you use it.
Security and cameras. Door and window sensors, keypads, and camera locations.
Doorbell. Wired video doorbell location.
Audio. In-ceiling or in-wall speakers, outdoor speakers.
Shades. Power or wiring for motorized window treatments.
Conduit. Empty pipe to the attic or TV walls for future runs.
Some electricians handle this, and some builders use a separate low-voltage contractor. Ask yours who’s responsible and when they’re on site.
What is structured wiring in a new home?
Structured wiring in a new home means running all your low-voltage cables back to one central panel or closet, instead of daisy-chaining them. That central spot holds your modem, router, network switch, and any security or audio equipment.
Put it somewhere with power, some ventilation, and easy access. A utility closet, a laundry room wall, or a corner of the garage are common choices, depending on climate and the house. Don’t bury it in an attic.
How do you plan smart home wiring in new construction, step by step?
Plan it room by room with your furniture layout, before the walkthrough. Here’s how I’d do smart home wiring in new construction:
Pick the central location. Where the internet comes in and the equipment lives.
Mark every TV location. Including the patio and bedrooms you might use later.
Mark work and media spots. Offices, desks, game consoles.
Place wireless access points. Usually on ceilings, centered in the areas you use most.
Place cameras and the doorbell. Entries, garage, driveway, backyard.
Decide on speakers. Rooms, patio, and where the volume controls go.
Decide on shades. Which windows might get motorized shades.
Add conduit. To the attic and behind TV walls.
Confirm it in writing. At the electrical or low-voltage walkthrough.
Write every location down on the room’s selection list as you go. The Custom Home Selection Sheet Template is the same set of sheets builders use, handy for keeping every decision in one place, wiring included.
What should be on your prewire new construction checklist?
Here’s a prewire new construction checklist to bring to the walkthrough:
Network drops. Every TV, office, and bedroom desk spot.
Ceiling access points. One per main area or floor, depending on the size of the house.
TV walls. Power and data at mounting height, plus conduit to a lower box.
Exterior cameras. Eaves and corners covering doors and driveway.
Video doorbell. Front door, and any side entry you use daily.
Speakers. Living area, kitchen, patio.
Motorized shades prewire. At windows that are tall, hard to reach, or getting shades later.
Garage. Network for a future car charger or gym equipment if you want it.
Central closet power. Enough outlets for the equipment.
For shades in particular, see window treatments for new construction.
What does a sample low voltage plan look like?
Here’s a hypothetical plan for a three-bedroom house:
Central closet: Laundry room, with two outlets and a shelf
Network drops: Living TV, office desk, primary bedroom TV, two secondary bedrooms
Access points: Two ceiling locations, one per main zone
Cameras: Front door, garage, back patio, driveway corner
Doorbell: Front door, wired
Speakers: Pair in living room, pair on patio
Shades: Prewire at the two-story living room windows
Conduit: Living TV wall to attic
Every line has a location the low-voltage installer can mark on the studs. Cost varies widely by market and scope, so get it priced in writing before rough-in.
When does low voltage prewire happen?
Usually after the electrical rough-in, before insulation and drywall. Timing varies by builder, so ask where it falls in the schedule and when your decisions are due. The selections schedule for construction shows how it fits with other decisions.
Walk it before insulation goes in. That’s also a good time for the pre-drywall walkthrough, where you can photograph every wall for later.
What are the common low voltage wiring mistakes?
Most mistakes come from deciding too late or under-wiring because Wi-Fi “should be fine.”
No central location planned. Equipment ends up in a bedroom closet.
Relying only on wireless. Wired access points tend to help a lot in larger homes.
Forgetting the outside. Patio TV, cameras, speakers.
No conduit. Future upgrades mean opening walls.
No photos before drywall. You’ll want to know where every cable runs.
Keep the plan, the changes, and the photos together. The Custom Home Selection Sheet Template is the system that keeps wiring decisions organized with every other selection. And coordinate it with your electrical walkthrough so the two plans agree.
Frequently asked questions
Is low voltage prewire worth it if everything is wireless?
Usually yes. Wireless devices still need power, and wired access points and TVs tend to perform better. Wire is cheap compared to opening walls later.
Who installs low voltage wiring?
It depends on the builder. Some electricians do it, and some builders use a separate low-voltage contractor.
Can I add low voltage wiring after drywall?
Often, but it’s harder and costs more. Some runs, especially across floors, may not be practical.
What cable should be used for network wiring?
Ask your installer what they recommend for your house. Many use a current-category network cable rated for higher speeds, plus conduit for future upgrades.
BTW, if you want every network drop, camera, and speaker location written down before drywall goes up, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

