Window treatments for new construction should be planned before drywall, even though they’re installed after move-in or near the end of the build. The early decisions are which windows get motorized shades (so they can be prewired), where you need blocking for heavy drapery hardware, whether shades mount inside or outside the window frame, and how window trim will work with them. Measure for the actual product only after the windows and trim are installed.
Leave it to the end and here’s what happens. You move in to bare windows, privacy problems in the bedrooms, and a two-story window that’s impossible to cover without a ladder and a prayer. Then you learn motorized shades would have needed wiring that’s now behind finished drywall.
When should you plan window treatments for new construction?
Plan window treatments for new construction during the electrical and low-voltage walkthroughs, after framing and before insulation. That’s when you can still add wiring, power, and blocking cheaply. Final measurements and ordering usually happen after trim and paint, and many products have lead times of several weeks, so place the order before move-in.
What should you decide before drywall, step by step?
Walk every window with your plan and decide these items:
List every window. Room, size, and how much privacy and light control it needs.
Pick the treatment type. Shades, blinds, shutters, drapery, or nothing.
Mark motorized windows. Tall, hard-to-reach, or large windows are good candidates.
Plan power or wiring. Hardwired shades need power at the head of the window. Battery shades may not, but ask.
Add blocking. Above windows getting drapery rods or heavy hardware.
Check window trim. Inside mounts need enough depth in the frame or jamb.
Check clearances. Door handles, cranks, and casements can interfere with blinds.
Write it all down. Window, treatment, mount type, and power, on your selection sheet.
The Custom Home Selection Sheet Template is the same set of sheets builders use, handy for keeping every window treatment decision in one place.
What is a motorized shades prewire?
A motorized shades prewire means running power or low-voltage wire to the top of each window that might get motorized shades, while the walls are open. It’s usually a small cost during construction compared to opening finished walls later. Even if you aren’t buying motorized shades now, prewiring the windows you might automate later keeps the option open.
Coordinate it with the rest of your wiring plan. See low voltage prewire for new construction for what else to run at the same time.
What are the best blinds for new construction?
The best blinds for new construction depend on the room and what you need from it. A checklist by room:
Bedrooms. Blackout or room-darkening shades, often layered with drapery.
Living areas. Light-filtering or solar shades to cut glare and keep the view.
Kitchen. Easy-clean shades or faux-wood blinds that handle moisture and grease.
Bathrooms. Moisture-resistant products and privacy from the bottom up.
Tall or two-story windows. Motorized shades or fixed panels.
Doors with glass. Shades mounted to the door, or a door with built-in blinds.
West-facing glass. Solar shades or heat-reducing fabrics.
Inside mount or outside mount?
Inside mounts sit inside the window opening for a clean, built-in look, but they need enough frame depth and square openings. Outside mounts sit on the wall or trim, cover more of the window, and block more light around the edges. Your choice affects window trim. If you want inside mounts, tell your builder before trim so the jamb depth works.
Shutters are their own case. They usually mount to the window frame or trim and need a square, solid surface to look right, so if you want them, say so early and let your builder and installer agree on how the trim gets detailed.
What does a sample window treatment plan look like?
Here’s a hypothetical plan for a few rooms:
Great room, two-story windows: Motorized solar shades, prewired at the head, inside mount
Primary bedroom: Blackout roller shades plus drapery panels, blocking above for the rod
Kitchen sink window: Light-filtering roller shade, inside mount
Primary bath: Top-down, bottom-up shade for privacy
Secondary bedrooms: Room-darkening shades, inside mount
Back door: Door-mounted shade
Timing: Prewire and blocking before drywall; measure after paint; order four to six weeks before move-in
Every line answers the questions your electrician, framer, and installer will ask.
What are the common window covering mistakes in a new home?
Most window coverings new home mistakes come from waiting too long.
No prewire. Motorized shades become harder to add.
No blocking. Drapery rods anchored to drywall.
Measuring too early. Before trim and windows are final.
Ordering too late. Bare bedroom windows for weeks after move-in.
Ignoring HOA rules. Some communities have rules for what’s visible from the street. Check yours.
Forgetting temporary coverings. Have a plan for privacy until the real ones arrive.
Add window treatments to your move-in plan so they don’t fall through the cracks. See the new construction move-in checklist. For the windows themselves, see window and door selections.
How do you keep window treatment decisions organized?
Keep a line for every window: room, size, treatment, mount, power, and status. That one list feeds your walkthrough, your installer, and your budget.
The Custom Home Selection Sheet Template is the system that keeps every window, along with every other finish, organized from framing to move-in.
Frequently asked questions
Do builders install window treatments?
Some include basic blinds, many don’t. Ask your builder what’s included and whether they can coordinate an installer.
How much should I budget for window treatments?
It varies widely by product, window count, and motorization. Get quotes early so it’s part of your overall budget.
Can I install shades before move-in?
Often yes, after paint and cleaning. Coordinate with your builder so the installer has access and the house is ready.
Are motorized shades worth it?
For tall or hard-to-reach windows, many people find them very useful. For standard windows, it’s more of a convenience choice.
BTW, if you want every window’s shade, mount, and prewire written down before the drywall goes up, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

