Cabinet selections for new construction start with the layout, which depends on your appliances and plumbing fixtures, then move to construction type, door style, material, finish color, interior accessories, and trim details. Cabinets usually need to be finalized and approved on shop drawings well before drywall is finished, because many cabinet shops need several weeks or more to build them.
Cabinets are a big line item and a long lead item, and they touch almost every other kitchen and bath decision. They’re also where I see homeowners make a decision on Monday and want to change it on Friday. That’s fine, as long as the cabinet shop hasn’t started cutting.
How do you start choosing cabinets for a new home?
Start with what goes in and around the cabinets, then pick the look. Choosing cabinets for a new home in the right order looks like this:
Appliances. Exact models and dimensions. See appliance selections for new construction.
Sinks and plumbing. Sink size and type, and faucet locations.
Layout. Run lengths, island size, upper cabinet heights, and where the tall pantry or oven cabinets go.
Construction type. Framed or frameless, and overlay or inset doors.
Door style and material. Shaker, slab, raised panel, and the wood or material.
Finish. Paint color, stain, or factory finish.
Interior features. Drawers versus doors, roll-outs, organizers, trash pull-outs, and spice pull-outs.
Trim and details. Crown, light rail, panels, and toe kicks.
What is the difference between custom and semi-custom cabinets?
Custom cabinets are built to your exact dimensions and specifications, often by a local shop. Semi-custom cabinets come in standard sizes with a range of modifications, styles, and finishes. Stock cabinets come in fixed sizes and fewer options.
Custom. Most flexibility in size, finish, and detail. Usually the highest cost and often a longer timeline.
Semi-custom. A good middle ground for many homes. Standard boxes in many widths, with fillers to close gaps.
Stock. Lowest cost and often fastest. Fewer sizes and finishes, so more fillers and compromises.
Custom vs semi-custom cabinets isn’t really a quality question. Both can be well built. It’s a question of how much flexibility you need and what your budget allows. Ask your builder what they include in the base specification.
How does a cabinet allowance work?
A cabinet allowance is an amount in your contract for cabinets based on a certain level of quality and scope. Upgrades above it are usually paid through a change order. Cabinet allowances can be written a few ways, so read yours carefully.
Lump sum or per linear foot. Is it a total figure, or a price per foot of cabinet run?
What’s included. Installation, hardware, crown, panels, and finish may or may not be covered.
Which rooms. Kitchen only, or baths, laundry, and built-ins too?
Overages. How they’re billed and whether markup applies.
Say your builder’s cabinet allowance is based on painted shaker semi-custom cabinets. Switching to inset custom cabinets with a stained finish could move the price a lot. That might be worth it to you. Just know before you approve the drawings. The construction allowance article explains the mechanics.
When are cabinet selections for new construction due?
Cabinet selections for new construction are typically due before or during framing so shop drawings can be prepared, with final approval due well before drywall finish. Exact timing depends on your cabinet shop’s lead time. Your builder’s selections schedule should show it.
The usual steps:
Choose the style, material, and finish.
Cabinet shop measures the framed house, if they’re custom.
You review and approve shop drawings.
The shop builds and finishes the cabinets.
Installation after drywall and, often, after some flooring.
What should you check on cabinet shop drawings?
Review the drawings slowly and in writing. This is the last cheap moment to change anything.
Appliance openings. Match the model numbers on your appliance list.
Drawer and door layout. Especially near the range and dishwasher.
Trash and recycling. Location and size.
Upper heights. To the ceiling, or with space above?
Panel ends and fillers. Where they go, and if refrigerator doors can open fully.
Bath vanity height. Standard or comfort height.
Finish color and sheen. Approve a sample door, not a printed chip.
How do you keep cabinet decisions organized?
Track each room’s cabinets on its own line: room, cabinet line or shop, door style, material, finish, hardware, accessories, approval date, and cost against the allowance. Keep the approved drawings with it.
The Custom Home Selection Sheet Template is the same set of sheets builders use, and it keeps cabinet and finish decisions in one place.
Once cabinets are set, countertops come next. See countertop selections for a new home, and the kitchen selections checklist for the full order.
Frequently asked questions
Are painted or stained cabinets better?
Neither is better in general. Painted cabinets can show chips at edges, and stained wood shows grain and natural variation, so pick the trade-off that suits your household.
Should cabinets go to the ceiling?
Many people like it for storage and a cleaner look. It costs more and can make the top shelves hard to reach, so it depends on the ceiling height and budget.
Can I change my cabinet color after ordering?
Possibly, if the shop hasn’t finished them yet, but it may cost money and time. Once finished, a color change is usually expensive.
How long do custom cabinets take?
It varies by shop and season, often several weeks or more after drawings are approved. Ask your builder for the current lead time.
BTW, if you want every cabinet style, finish, and accessory written down before shop drawings are approved, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.