Exterior Selections for a New Home: Siding, Roof, Windows, and More

Exterior selections for a new home include the roofing, siding or masonry, windows, exterior doors, garage door, trim, soffit and fascia, gutters, paint colors, and exterior lighting. Most are due early, before framing is finished, because windows, roofing, and masonry have long lead times and set the look of everything else. Choose them together as one palette, then confirm any HOA or local rules before ordering.

The outside of the house is the part everybody sees, including your neighbors and your future buyer. It’s also the hardest set of finishes to change once installed. You can repaint a bedroom on a Saturday. You can’t re-roof on a Saturday.

What are exterior selections for a new home?

Exterior selections for a new home are every visible material and color on the outside. Here’s the list:

  1. Roofing. Material, color, and profile.

  2. Wall cladding. Siding, brick, stone, stucco, or a combination, plus the color and any pattern or coursing.

  3. Windows. Frame material, interior and exterior color, grid pattern, and hardware finish.

  4. Front door. Material, style, glass, color or stain, and hardware.

  5. Other exterior doors. Patio, sliding, or folding doors.

  6. Garage door. Style, windows, color, and opener.

  7. Trim, soffit, and fascia. Material and color.

  8. Gutters and downspouts. Style, material, and color.

  9. Exterior paint colors. Body, trim, accent, and door.

  10. Exterior lighting. Entry, garage, patio, and landscape lighting.

  11. Hardscape. Driveway, walkways, and patio surfaces.

How do you choose siding and roofing selections together?

Pick the roof and the main wall material as a pair, because they’re the two largest surfaces you’ll see. Siding and roofing selections should be reviewed side by side, ideally with real samples outside in daylight, not on a screen.

  • Start with the dominant material. If the house is mostly brick or stone, choose that first. Masonry colors are limited and hard to change.

  • Match the roof to the style. Some roof materials suit certain architectural styles better than others.

  • Look at it from the street. Small samples look different from a whole wall. Ask your builder for addresses of homes using the same materials and drive by.

  • Think about climate. Roof color and material can affect heat gain and maintenance. Your builder will know what holds up locally.

How do you pick exterior color selections?

Choose colors in this order: fixed materials first (roof, brick, stone, windows), then siding and trim paint to work with them, then the front door as the accent. Exterior color selections that start with paint usually end with a paint color fighting a roof you can’t change.

  1. Fixed colors. Roof, masonry, and window frames.

  2. Body color. The main siding or stucco color.

  3. Trim color. Fascia, corners, and window trim.

  4. Accent. Front door, shutters, or a feature wall.

Paint large samples on the actual house and look at them morning and evening. Colors outside usually look lighter than on the chip. The article on paint color selections walks through sampling.

When are new construction exterior finishes due?

New construction exterior finishes come due earlier than most homeowners expect. A rough order:

  • Windows and exterior doors. Often due before or during framing, because of lead times. See window and door selections.

  • Roofing. Due around framing, so it can go on as soon as the house is dried in.

  • Masonry and siding. Due before the house is wrapped and ready for cladding, usually earlier if the material has a lead time.

  • Garage door. Often ordered weeks ahead.

  • Paint colors, lighting, and gutters. Later, but before exterior paint and trim-out.

Your builder’s selections schedule should have each date.

Do HOA or local rules affect exterior selections?

Often, yes. Many neighborhoods have deed restrictions or HOA guidelines that limit roof material, colors, masonry percentage, garage door orientation, and more. Some cities have design standards too. These vary by neighborhood and jurisdiction.

  • Get the guidelines early. Before design, ideally before you buy the lot.

  • Find out the approval process. Some HOAs require submittals and approval before construction or before changes.

  • Build in time. Approval can take weeks.

  • Get approvals in writing. Keep them with your selections.

How do you keep exterior selections organized?

Write down each item with the manufacturer, product, color name and code, quantity or area, supplier, cost against the allowance, approval date, and HOA approval if required. Keep physical samples and photos. When the siding crew asks which trim color goes where, the answer should be on paper.

The Custom Home Selection Sheet Template is the same set of sheets builders use, and it’s handy for keeping every exterior decision in one place.

For the inside of the house, the custom home selections checklist covers every room.

Frequently asked questions

What should I choose first on the exterior?

Start with the roof and the main wall material, especially masonry, because those have the fewest color options and are hardest to change. Then choose paint colors to work with them.

Why are windows due so early?

Windows often have long lead times and need to be installed when framing is done to dry in the house. A late window order can stall the whole schedule.

Can I change exterior colors after construction starts?

Paint colors can often change before painting begins. Roofing, masonry, and window colors usually can’t once ordered without cost and delay.

Do I need HOA approval for exterior selections?

Many neighborhoods require it, but it varies. Check your deed restrictions and HOA guidelines before finalizing anything.

BTW, if you want every roof, siding, window, and paint color written down in one place, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.