What’s inside the subcontractor paperwork package
Risks of injury, construction defects, and business disputes are ever-present in this business. The way to keep an iron clad system is simple: no trade partner works without complete, current paperwork. This package gives you the request and the tracker.
Trade Partner Requirements letter
A one-page cover letter you send to every new subcontractor. It lists the six things they must return before they work for you, including a signed base agreement, a job rules addendum, a W-9, a workers’ comp waiver, and a certificate of liability insurance, with the insurance terms you require spelled out. Provided in Word and PDF.
Trade Partner Tracking Dashboard
An Excel list with one row per trade partner and a column for each requirement:
Signed independent contractor base agreement
Signed job rules addendum
Current insurance, additional insured status, and waiver of subrogation
Signed workers’ comp waiver
IRS W-9
Liability expiration date
Available to hire, which flags insurance that has expired or is about to
Instructions
Where to get the agreements and forms for your state
Who in your company should own the dashboard and how often to review it
How to warn trades before their insurance expires
How to send the whole request as one package when a new trade comes on
What is not included
This package does not include a subcontractor agreement, job rules addendum, workers’ comp waiver, W-9, or lien waivers. Those documents depend on your state. The instructions tell you where to source each one, such as your state or local builders association or a construction attorney.
Format
One Word document, one PDF, one Excel file, and a 2-page PDF of instructions, delivered as an instant download.
Before you use it
The letter and the tracker come from a Texas builder and carry our company details and insurance terms as examples. Replace them with your own, set your insurance requirements with your agent, and have your attorney review your paperwork.
Learn the method
Read our subcontractor paperwork checklist, subcontractor insurance requirements, and how to read a certificate of insurance.

