What’s inside the budget and specifications template
If you want happy clients and fewer “oh shucks” moments, this is the system. The budget and the specifications live in the same document, so every number has a description of exactly what it buys.
Two workbooks
Custom Home Budget and Specifications Template. Adds an owner contingency line, a section for client pre-paid expenses, and upgrade and value engineering options.
Spec Home Budget and Specifications Template. The same structure, trimmed for homes you build to sell.
Three columns, about 100 line items
Each line has a cost code, a notes and specifications cell, and a total. The cost codes run in build order:
Soft costs: surveys, design and architectural fees, engineering, permits, insurance, inspections, and utilities
Site work: demolition, excavation, retaining walls and drainage, tree work, and erosion control
Structure and envelope: foundation, framing, trusses, steel, windows, doors, roof, and waterproofing
Mechanical systems: HVAC, plumbing, electrical, and structured wiring
Interior: insulation, drywall, trim, paint, cabinets, countertops, tile, and flooring
Fixtures and finishes: plumbing fixtures, appliances, lighting, hardware, mirrors, and shower enclosures
Exterior: masonry, stucco, flatwork, landscaping, irrigation, fencing, and pool
Project contingency, builder overhead, and builder net income
Specifications already written
The specifications column comes loaded with the prompts and defaults we use, so you edit instead of starting from zero. Several trades also get their own note block with instructions for the framer, trim carpenter, and electrician. The same text works three ways: it keeps items from being forgotten, it becomes the scope of work in your bid requests, and it becomes the specifications in your client contract.
A guide to our budgeting process
How we build a fast bank budget for a spec home, then a start budget from hard bids
How we track every deviation after the start
How much contingency we carry and how we use it
How we run the pre-bid meeting, bidding, and budget review on a custom home
Why we show value engineering and upgrade options at the bottom of every budget
Format
Two Excel files (.xlsx) and a 3-page PDF guide, delivered as an instant download.
Before you use it
The defaults reflect how we build in Austin, Texas, including local requirements and the brands we prefer. Edit them to match your market, your trades, and your standards, and have your attorney review anything that becomes part of your contract.
Learn the method
Read Construction Budget and Specifications, how to write construction specifications, and how much contingency to carry.

