Hardware selections for new construction cover three groups: door hardware (entry locksets, interior knobs or levers, hinges, and stops), cabinet hardware (knobs and pulls), and bath hardware (towel bars, rings, hooks, and paper holders). Pick one main finish or a planned mix, choose function before style, and get your choices to your builder early enough for blocking, door prep, and ordering. A finish hardware schedule lists every piece by room and door.
Hardware is the jewelry of the house. It’s small, it’s everywhere, and you touch it every day. It’s also the category where a missing box of hinges can hold up a trim carpenter for a day, so it’s worth getting organized.
What are hardware selections for new construction?
Here’s the full list of hardware selections for new construction most homes need:
Entry door hardware. Handleset or lever, deadbolt, and possibly a smart lock.
Interior door hardware. Passage, privacy, and dummy sets for each door.
Hinges. Finish, and sometimes size or type for heavier doors.
Door stops. Baseboard, hinge pin, or floor stops.
Specialty doors. Pocket door pulls, barn door hardware, and closet door hardware.
Cabinet hardware. Knobs and pulls for kitchen, baths, laundry, and built-ins.
Bath hardware. Towel bars, towel rings, robe hooks, paper holders, and grab bars.
Other. Shelf and rod brackets, house numbers, and mailbox.
How do you choose door hardware selections?
Choose the function for each door first, then the style and finish. Door hardware selections have more function decisions than people expect.
Passage. No lock, for hallways and closets.
Privacy. Push-button or turn lock, for bedrooms and bathrooms.
Dummy. Fixed handle with no latch, often on double closet doors.
Keyed. For exterior doors and sometimes an office or storage room.
Levers or knobs. Levers are easier for kids, older adults, and full hands.
Handing. Some levers are handed, meaning they’re made for left or right swing.
Walk the plans with your builder and mark each door. The trim carpenter will thank you.
How do you choose cabinet hardware selections?
Pick a style family, decide knobs versus pulls by location, and size pulls to the drawer. Cabinet hardware selections are often due later than other cabinet decisions, but the cabinet installer needs them before finishing the install.
Knobs or pulls. Many kitchens use knobs on doors and pulls on drawers, or pulls everywhere.
Size. Larger drawers often get longer pulls. Appliance pulls for panel-ready fridges are a separate item.
Placement. Decide where pulls sit on doors and drawers so it’s consistent.
Test it. Hold a sample in your hand. Some pulls look great and feel sharp.
Count carefully. Every door and drawer, plus a few extras.
See cabinet selections for new construction for the cabinet side.
Should hardware finishes match throughout the house?
They don’t have to, but they should be intentional. Many people keep door hardware one finish throughout the house, and let kitchens and baths coordinate with their plumbing fixtures.
Door hardware. Usually one finish house-wide for consistency.
Kitchen. Cabinet hardware often coordinates with the faucet and lighting.
Bath. Bath accessories usually match the plumbing fixtures in that room.
Mixing. A planned mix of two finishes can look great. A random mix of five usually doesn’t.
Finishes vary between manufacturers, even when they share a name. Look at samples together. The articles on plumbing fixture selections and lighting selections cover the other metal finishes in the house.
What is a finish hardware schedule?
A finish hardware schedule is a list of every piece of hardware by location: each door with its function, lockset, hinges, and stop, plus cabinet and bath hardware by room. On commercial jobs it’s a formal document. On homes, a simple version prevents most of the mistakes.
Include:
Door number or location.
Function. Passage, privacy, dummy, or keyed.
Product and finish. Manufacturer, model, and finish.
Hinge and stop. Finish and type.
Cabinet and bath hardware. By room, with quantities.
The Custom Home Selection Sheet Template is the same set of sheets builders use, and it works well for keeping your hardware choices with every other selection.
When are hardware selections due?
Bath hardware locations need blocking, which means deciding before drywall. Door hardware is needed for trim-out, and cabinet hardware is needed when cabinets are finished. Your builder’s selections schedule will have the dates. Order with a little extra time, because hardware backorders are common and annoying.
When the boxes arrive, check them against your list before the installer opens them. Wrong finishes and short counts are much easier to fix while everything is still in the box, and before anyone has drilled a hole in a cabinet door.
Frequently asked questions
When do I need to decide where towel bars go?
Before drywall, so the framer or carpenter can add blocking. Decide the layout during the framing walk.
Are levers or knobs better for interior doors?
Levers are generally easier to use for everyone, especially kids and older adults. Knobs suit some traditional styles.
How many cabinet pulls do I need?
One per door and drawer, sometimes two on wide drawers. Count from the cabinet drawings and order a few extras.
Can I install my own hardware after closing?
Often yes, especially cabinet hardware. Ask your builder whether it affects anything in the contract or warranty.