Lighting Selections for a New Home: A Room-by-Room Plan

Lighting selections for new construction happen in two stages: first the lighting plan (where every recessed light, pendant, sconce, switch, and outlet goes) before electrical rough-in, then the decorative fixtures themselves before trim-out. Work room by room, think in layers of general, task, and accent light, and check each fixture against your lighting allowance as you go.

Lighting is one of the few selections that changes how every other finish looks. A great countertop under bad light looks like a mediocre countertop. It’s also one of the easiest things to get wrong, because the decisions that matter most happen on a framed house with no ceilings.

What is a new construction lighting plan?

A new construction lighting plan is a drawing or marked-up floor plan showing every light, switch, dimmer, and outlet. Your builder or electrician uses it to set boxes and run wire during rough-in. Once the drywall is up, moving a light gets expensive.

A good plan answers these questions for every room:

  • General light. What lights the whole room? Recessed lights, a ceiling fixture, or both?

  • Task light. Where do you need focused light, like counters, desks, vanities, and reading spots?

  • Accent light. Anything you want to highlight, like art, shelving, or a fireplace?

  • Controls. Where the switches go, which lights are on dimmers, and which are switched together.

How do you do lighting selections for new construction room by room?

Here’s the room-by-room pass I’d make on the plan before rough-in:

  • Kitchen. Recessed lights for general light, pendants over the island, under-cabinet lights for the counters, and possibly lighting inside glass cabinets.

  • Dining. A centered chandelier, which means knowing the table location, plus a dimmer.

  • Living room. Recessed or a ceiling fixture, a ceiling fan box if you want one, and floor outlets if furniture floats in the room.

  • Bathrooms. Sconces beside or above the mirror, a light in the shower if allowed and wanted, and a fan.

  • Bedrooms. A fan or fixture box, and switched outlets or sconces near the bed.

  • Hallways and stairs. Switches at both ends, and step lights if you like them.

  • Closets and pantry. A light in every closet, ideally on a door switch or sensor.

  • Exterior. Entry lights, garage lights, patio and soffit lights, and landscape lighting circuits.

Code sets minimums for things like switch and outlet locations, and the rules vary by area. Your builder and electrician will know what your local code requires.

When should you choose light fixture selections?

The plan is due before rough-in. The light fixture selections themselves are typically due a few weeks before trim-out, though some decisions need to be made earlier:

  1. Pendant and chandelier locations before rough-in, since the box has to be centered on the island or table.

  2. Heavy fixtures before rough-in, so the electrician installs a box and blocking rated for the weight.

  3. Sconce heights and spacing before rough-in, which means knowing your mirror and vanity size.

  4. Decorative fixtures early enough to arrive before trim-out. Some take weeks.

Your builder’s selections schedule should list both dates. If it doesn’t, ask.

How does a lighting allowance work?

A lighting allowance is a dollar amount in your contract for decorative fixtures you haven’t chosen yet. Recessed lights and basic wiring are often in the base price, while chandeliers, pendants, sconces, and fans come out of the allowance. Every contract is different, so read yours.

Questions to ask:

  • What’s included? Fixtures only, or bulbs, installation, and extra labor for heavy fixtures?

  • Are fans and exterior lights in it? They often are, and they eat the budget quickly.

  • How are overages billed? Usually by change order, sometimes with markup.

Say you have 30 decorative fixtures and a fixed allowance. Two statement chandeliers can use up half of it before you get to the bathroom sconces. Price the whole list first, then decide where to splurge. The article on construction allowance tracking explains how builders keep score.

What lighting mistakes are common in new homes?

  • Too few switches in the right places. Walk the path you’ll take at night and check for switches at each entry.

  • A single overhead light at the vanity. It casts shadows on your face.

  • Pendants that aren’t centered. Usually because the island size changed after rough-in.

  • No dimmers. Cheap to add early, annoying to add later.

  • Mixing color temperatures. Pick a bulb color and use it consistently.

  • Forgetting exterior and landscape lighting. Conduit and circuits are easier before concrete and landscaping.

How do you keep track of every fixture?

Make a fixture list by room: location, fixture name and model, finish, quantity, bulb type, supplier, and cost against the allowance. It sounds tedious. It’s less tedious than finding out a sconce was never ordered the week before move-in.

The Custom Home Selection Sheet Template is the same set of sheets builders use, and it’s handy for keeping every fixture and finish in one place.

Make sure your lighting finishes work with your plumbing and hardware. The hardware selections article covers how to coordinate metal finishes, and the custom home selections checklist covers the rest of the house.

Frequently asked questions

When do I do the electrical walkthrough?

Usually after framing and rough-in wiring, before insulation and drywall. It’s your chance to confirm every box location in person.

Should all my light fixtures match?

No, but they should feel related. Keeping finishes consistent within a room usually looks more intentional.

Can I buy my own light fixtures?

Many builders allow it, with conditions about delivery dates, warranties, and installation. Ask how your builder handles owner-supplied fixtures before you buy.

What is a good color temperature for home lighting?

Many homeowners prefer warmer light in living areas. The key is choosing one and using it consistently so rooms don’t look mismatched.

BTW, if you want every light fixture, location, and allowance tracked on one sheet, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.