A bathroom selections checklist for new construction covers the layout and rough-in decisions first (shower, tub, toilet, and vanity locations, valve type, and drain style), then the vanity and countertop, then tile, plumbing fixture finishes, glass, lighting, mirrors, and accessories. Rough-in items are due early, often before framing is done. Finish items are due before tile and cabinets get ordered.
Bathrooms look simple on a floor plan. They aren’t. A primary bath can have as many decisions as a small kitchen, and almost every one of them touches plumbing that gets buried in a wall. Decide early and write it down.
What goes on a bathroom selections checklist?
Here’s the bathroom selections checklist I’d use for every bath in the house, in the order the decisions come due:
Layout. Shower size, tub or no tub, toilet location, vanity length, and whether the toilet gets its own room.
Shower valve and trim. Single control or separate volume and temperature, handheld, rain head, body sprays, and the finish.
Drain type. Center drain or linear drain, and whether the shower is curbless.
Niches and benches. Size, location, and height. These get framed, so they’re early decisions.
Tub. Freestanding, drop-in, or alcove, and the tub filler type.
Toilet. Style, height, and rough-in dimension.
Vanity. Size, style, finish, drawer layout, and single or double sinks.
Countertop and sinks. Material, edge, and undermount or vessel sinks.
Faucets. Widespread or single hole, wall mount or deck mount.
Tile. Floor, shower walls, shower floor, accent tile, and grout color.
Glass. Frameless, semi-frameless, or a curtain, and the hardware finish.
Lighting and ventilation. Sconces, overhead lights, the exhaust fan, and any heated floor.
Mirrors and accessories. Mirror size, towel bars, hooks, paper holder, and grab bar blocking.
Which new construction bathroom selections are due first?
The ones that live inside the wall. New construction bathroom selections that affect rough-in plumbing, framing, or electrical are due before those trades show up, which is usually well before you’ve seen a single tile sample.
Shower valve type. The valve body goes in at rough-in. The trim comes later, but it has to match the valve.
Wall-mount faucets. The supply lines go in the wall at a specific height.
Linear drains and curbless showers. These can affect the floor framing or slab.
Freestanding tub fillers. Floor-mount fillers need supply lines in a specific spot.
Blocking. For grab bars, towel bars, heavy mirrors, and glass.
Sconce locations. The electrician sets boxes based on the mirror and vanity size.
Change one of these after rough-in and you’re paying to open the wall. The plumbing fixture selections article goes deeper on the rough-in side.
How do you choose master bath selections?
Start with how you’ll use the room, then pick the look. Master bath selections are the most personal ones in the house, and also the easiest place to blow the budget, because every upgrade looks reasonable on its own.
A few questions to answer before you shop:
Do you actually take baths? A freestanding tub takes a lot of space and money. If you won’t use it, a bigger shower may serve you better.
Who shares the vanity? Two sinks need enough length to be comfortable.
Do you want a curbless shower? Great for aging in place, but it needs to be planned into the structure.
Where does the light come from? Side sconces at the mirror usually light faces better than a single overhead fixture.
Storage. Linen closet, drawers in the vanity, or a tall cabinet.
How do you make bathroom finish selections that work together?
Pick the tile and the vanity together, then choose a single metal finish for the plumbing and decide how the lighting and hardware relate to it. Bathroom finish selections go wrong when each piece is picked on a different day from a different showroom.
Lay the samples out together. Floor tile, wall tile, vanity finish, countertop, and a faucet sample.
Keep the shower floor practical. Smaller tile and more grout lines are less slippery.
Choose grout on purpose. A contrasting grout makes a pattern stand out. A matching grout hides it.
Check finishes in the same light. Brushed brass from two manufacturers can look like two different metals.
Tile decisions have their own trade-offs, which I cover in tile selections for new construction.
How do you track bathroom selections across several baths?
Use one sheet per bathroom, with the same fields on each: item, product, finish or color, quantity, supplier, cost versus allowance, and approval date. With three or four baths, it’s very easy to mix up which tile goes where or order one faucet short.
The Custom Home Selection Sheet Template is the same set of sheets builders use, and it’s handy for keeping every bathroom decision in one place.
Then compare your list with your builder’s before anything gets ordered. Mismatches are cheap to fix on paper.
What bathroom decisions do homeowners forget?
Exhaust fan noise and size. A quiet fan gets used. A loud one doesn’t.
Outlet in the vanity drawer or near the mirror. For hair tools and toothbrushes.
Shower glass height and door swing. Doors should swing out or both ways in most cases.
Toilet paper holder location. Reachable from the toilet, not behind you.
Night lighting. A low light or toe kick light for midnight trips.
Allowances. Know what each bath’s plumbing and tile allowance covers before you fall in love. See construction allowances.
For the rest of the house, the custom home selections checklist covers every room.
Frequently asked questions
When do I need to choose my shower valve?
Before plumbing rough-in, because the valve body goes in the wall then. Your builder can tell you the exact date on your schedule.
Should every bathroom have the same finishes?
Not necessarily. Many people keep secondary baths simpler and put the budget into the primary bath. Using the same faucet line in several baths can simplify ordering and repairs.
What is the most common bathroom selection mistake?
Picking pieces in isolation. A tile, vanity, and faucet can each look great alone and clash together, so look at them side by side before you approve.
Do bathroom selections affect the schedule?
Yes. Late valve or tile decisions can hold up rough-in or tile work, and every trade after them waits too.
BTW, if you’re juggling selections for three or four bathrooms at once, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

