Tile selections for new construction cover every tiled surface: shower walls and floors, bathroom floors, kitchen backsplash, laundry and mudroom floors, and any fireplace or accent walls. For each one you choose the tile, size, pattern, layout, grout color, and edge or trim detail. Tile is usually due several weeks before installation, and shower details like niches, benches, and drains are due much earlier, during framing and plumbing rough-in.
Tile regret is real. It’s the finish people mention most when they talk about what they’d change. Usually it’s not the tile itself. It’s the grout, the pattern, the edge, or how it meets something else. Those are all decisions you can make on purpose.
How do you start choosing tile for a new home?
List every tiled surface first, then pick tile for the most visible one and work outward. Choosing tile for a new home is much easier when you’re picking for a specific wall, not browsing a showroom.
Make the list. Every bath floor, shower wall, shower floor, tub surround, backsplash, laundry, mudroom, and fireplace.
Pick the anchor. Usually the primary shower or the kitchen backsplash.
Coordinate with fixed finishes. Countertops, cabinets, and flooring.
Simplify secondary spaces. Guest baths and laundry don’t need to compete with the primary bath.
What do you decide for shower tile selections?
Shower tile selections have more decisions than any other tiled area, and some are due early:
Layout details (early). Niche size and location, bench, curb or curbless, and drain type and location.
Wall tile. Material, size, finish, and pattern.
Floor tile. Usually smaller format with more grout lines for slip resistance and drainage slope.
Accent tile. Niche back, feature wall, or a band.
Tile height. To the ceiling or a set height.
Edges and trim. Metal trim, bullnose, or a finished edge.
Grout color and type. Your installer may recommend a specific grout for showers.
Waterproofing method is your builder’s call, but ask how the shower is waterproofed. It’s the part you can’t see that matters most. The bathroom selections checklist covers the rest of the room.
How do you get tile selections for new construction right?
Tile selections for new construction go right when you decide the details most people skip. These are where regret usually comes from:
Grout color. Matching grout hides the pattern and can look calmer. Contrasting grout makes every line visible. Light grout on floors shows dirt.
Pattern. Stacked, offset, herringbone, and others. Some patterns use more tile and labor.
Layout and centering. Where cuts land. Ask your installer how they plan to center the layout on the wall or niche.
Edges. How tile ends on an open wall or at the backsplash.
Transitions. Where tile meets wood or other flooring.
Large format tile. Looks great, but needs flatter surfaces and may cost more to install.
Lay out samples with your countertop, cabinet, and plumbing finish together before approving.
How does a tile allowance work?
A tile allowance is an amount in your contract for tile material, sometimes per square foot and sometimes a lump sum. Labor may be separate, and patterns or large formats can increase labor cost even if the tile itself is in budget.
Ask:
Material or installed? Does the allowance include labor, setting materials, and trim?
Pattern charges. Herringbone, mosaics, and large formats may carry extra labor.
Waste. Patterned layouts need more extra tile.
Overages. How they’re billed and if there’s markup.
Say you’re within the per-foot tile allowance, but you chose a herringbone backsplash and floor-to-ceiling shower tile. The labor can grow even when the material doesn’t. The construction allowance article explains how overages work.
When are tile selections due?
Shower layout decisions are due during framing and plumbing rough-in. Tile material, pattern, and grout are usually due several weeks before tile installation, which often follows drywall. Your builder’s selections schedule should list exact dates.
Specialty tile, imported tile, and handmade tile can have long lead times. Confirm availability before you finalize. If something is backordered, a late tile decision holds up plumbing trim, glass, and often the final cleaning.
How do you keep tile choices organized?
For each surface, write down the room, location, tile name, size, finish, pattern, layout notes, grout color, edge detail, square footage, supplier, and cost against the allowance. A quick sketch of the pattern helps the installer.
The Custom Home Selection Sheet Template is the same set of sheets builders use, and it’s handy for keeping every tile and grout decision in one place.
Keep a box of each tile as attic stock for future repairs. For the full list of finish decisions, see the custom home selections checklist.
Frequently asked questions
Should my shower floor match my bathroom floor?
It can, but shower floors often use smaller tile for slip resistance and slope. Many people coordinate the color rather than use the exact same tile.
What grout color is best?
It depends on the look you want. Matching grout looks calmer, contrasting grout highlights the pattern, and darker grout on floors hides dirt better.
When do I need to decide on a shower niche?
During framing, since niches are framed into the wall. Decide size and location before the framing walk.
How much extra tile should I order?
Your installer will set the waste amount based on the tile and pattern. Keep leftover boxes for repairs.
BTW, if you want every tile, grout color, and pattern note written down before the setter arrives, grab our Custom Home Selection Sheet Template over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.