A fix and flip calculator takes the after-repair value of the house and subtracts the purchase price, rehab costs, holding costs, financing costs, and selling costs. What’s left is your profit. The useful version also works backward: start from the after-repair value and your target profit to find the most you can pay for the house.
The math is grade-school subtraction. The danger is in the inputs. An optimistic after-repair value, a rehab budget with no contingency, or a timeline that ignores permits will turn a good-looking deal into a year of work for nothing. Most bad flips were bad the day they were bought.
What is the fix and flip formula?
The basic fix and flip formula is:
Profit = After-repair value - Purchase price - Rehab costs - Holding costs - Financing costs - Selling costs
And the version I use more often, the maximum offer:
Maximum purchase price = After-repair value - Rehab costs - Holding costs - Financing costs - Selling costs - Target profit
The second one keeps you honest. You decide the profit you need before you fall in love with the house, and the formula tells you what to offer.
What goes into a fix and flip deal analyzer?
Every fix and flip deal analyzer needs the same inputs. Miss one and the profit is overstated.
After-repair value (ARV). What the house will sell for once renovated, based on recent sales of similar renovated homes nearby.
Purchase price and closing. What you pay plus your buy-side closing costs.
Rehab budget. Line items for every trade, plus a contingency for what you’ll find behind the walls.
Holding costs. Taxes, insurance, utilities, HOA dues, lawn care, and security for every month you own it.
Financing costs. Points, fees, and interest for the months you carry the loan.
Selling costs. Commissions, seller closing costs, and any concessions.
Timeline. Months from closing to sale. It drives holding and financing costs.
How do you use a fix and flip profit calculator step by step?
Here’s the order I’d run it in.
Pull renovated comps. Three to five recent sales of similar size and finish. Use the middle, not the best one.
Walk the house with a trade partner. Build a line-item rehab budget, not a guess per square foot.
Add a contingency. Older houses hide problems. Size the cushion to the age and condition.
Estimate the timeline. Include permitting, which varies by city, plus construction and time on market.
Calculate holding and financing costs. Monthly costs times the timeline, plus loan fees.
Subtract selling costs. Use realistic commission and closing numbers for your area.
Set your target profit. In dollars and as a percentage of ARV.
Solve for maximum offer. If the asking price is above it, negotiate or walk.
Builders who also do ground-up work can run both deal types through one format, and the Spec Home Pro Forma Template gives you a quick yes or no in a page you can share with a lender.
Fix and flip calculator example with round numbers
A hypothetical deal:
After-repair value: $400,000
Rehab budget: $55,000
Contingency: $8,000
Holding costs: $1,000 a month for 6 months, $6,000
Financing: $15,000 in interest and fees
Selling costs: $26,000
Target profit: $40,000
Maximum purchase price, including closing: $400,000 - $55,000 - $8,000 - $6,000 - $15,000 - $26,000 - $40,000 = $250,000
If the seller wants $280,000, the deal only works if you accept $10,000 in profit, which is one bad surprise away from zero. That’s a pass.
What about the 70% rule?
The 70% rule is a common shortcut: pay no more than about 70% of ARV minus repairs. In the example, 70% of $400,000 is $280,000, minus $55,000 in repairs, gives $225,000. That’s more conservative than the full calculation.
It’s fine as a quick screen when you’re looking at a lot of listings. It’s not a substitute for the full math, because it ignores your actual financing, holding time, and selling costs, which vary a lot by market and price point. Use it to decide which houses deserve a full analysis.
What mistakes make a fix and flip calculator lie?
These are the inputs I see go wrong most.
ARV from the wrong comps. Comparing to a bigger house, a better street, or a nicer finish level.
Rehab budget per square foot. Every house is different. Walk it and price it by trade.
No contingency. Old plumbing, rot, and foundation issues show up after demo.
Short timeline. Permits, inspections, material delays, and a slow sale all add months.
Forgetting holding costs. Taxes, insurance, and utilities keep running whether anyone is working or not.
Ignoring your own time. If you’re managing the project, that’s a cost.
If you’re weighing a flip against a ground-up build, read fix and flip vs new construction.
How do lenders look at fix and flip numbers?
Lenders who fund flips usually focus on ARV, your rehab budget, and how much of your own cash is in the deal. Many size the loan as a percentage of purchase plus rehab, capped at a percentage of ARV. Exact terms vary widely by lender, so ask each one how they size loans before you make an offer.
Give them a clean, one-page summary with your comps and a line-item rehab budget. It gets you faster answers and fewer follow-up questions. For more on the private lending side, see hard money construction loans.
How do you keep your deal analysis consistent?
Run every deal through the same template, then compare the projection to what actually happened after you sell. Track where you missed: ARV, rehab, timeline, or selling costs. Over a few deals, your calculator gets sharper because your inputs get better.
Builders who move between flips and new construction benefit from one consistent format for both. The Spec Home Pro Forma Template keeps your numbers on the same page every time, and the spec home profit calculator walks through the ground-up version. If you’re scoping the rehab itself, see writing a fix and flip scope of work.
Frequently asked questions
How do you calculate ARV for a flip?
Look at recent sales of similar renovated homes nearby, matched on size, bedrooms, condition, and location. Use a realistic middle value, not the highest sale.
What is a good profit on a fix and flip?
It depends on the market, price point, and risk. Many investors set a minimum in dollars and as a percentage of ARV, and pass on deals that don’t clear both.
How much contingency should a flip budget have?
More for older houses and bigger scopes, less for cosmetic work. Size it to the condition of the house and what you couldn’t see during the walkthrough.
Are holding costs really that important?
Yes. Every month adds taxes, insurance, utilities, and interest. A few extra months can erase a thin profit.
BTW, if you want a quick, consistent way to give every deal a yes or no before you make an offer, grab our Spec Home Pro Forma Template over at the Building Optimal Shop, where you can check out the rest of our swag to build a better business. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

