A spec home budget is the full list of what it will cost to buy the lot, build the house, carry it, and sell it, before you know who the buyer is. A spec home budget that holds up has five buckets: land, hard costs, soft costs, financing and carrying costs, and selling costs, plus a contingency on top. Leave any bucket out and your profit is the thing that absorbs it.
On a custom home, a budget miss is a tough conversation with a client. On a spec home, there is no client. The miss comes straight out of your margin, or your investor’s, and nobody sends you a change order to cover it.
What goes into a spec home cost breakdown?
Here’s the spec home cost breakdown I’d use as a starting point. Every line belongs in the budget even if the number is small.
Land. Purchase price, closing costs, survey, due diligence, and any demolition or clearing.
Hard costs. Everything that goes into the house and site: foundation, framing, mechanicals, finishes, flatwork, landscaping, fencing.
Soft costs. Plans, engineering, permits and fees, impact or tap fees where they apply, utilities during construction, builder’s risk insurance.
Financing and carrying costs. Loan fees, interest during construction and during the selling period, property taxes, HOA dues, utilities while the house sits.
Selling costs. Commissions, closing costs on the sale, staging, photography, and any concessions you expect to give.
Contingency. A line for the things you can’t name yet. More on sizing it below.
If you want a deeper look at organizing hard costs, start with construction cost codes. A spec house budget built on consistent codes is one you can compare from house to house.
How do you estimate spec home construction costs?
Estimate spec home construction costs from the plans and specs, line by line, with trade pricing. A number per square foot is fine for the first ten minutes of looking at a lot. It is not a budget.
Finish the specs first. On a spec, you are the client. Make every selection before you price, or you’re budgeting against allowances you set for yourself and then blow through.
Get real bids on the big lines. Foundation, framing, roofing, plumbing, electrical, HVAC, and cabinets drive most of the cost. Bid those.
Use your last house for the rest. Actual costs from your most recent build beat any rule of thumb.
Price the site, not just the house. Driveway length, tree removal, retaining walls, and utility runs vary by lot and get missed.
The more spec homes you build from similar plans, the better this gets. Your actuals become your estimate.
How much contingency should a spec home budget carry?
Enough that a bad month doesn’t turn into a bad deal. Common practice is a percentage of hard costs, and the right percentage depends on how well you know the plan, the lot, and the trades. A plan you’ve built five times on a flat lot needs less than a new design on a sloped infill lot.
Two rules I’d hold to:
Keep it as its own line. Don’t bury contingency inside other lines. You want to see it get spent. See construction contingency.
Don’t count it as profit. If it’s left over at the end, that’s good news. Planning on it being left over is how deals go sideways.
What spec home costs do builders forget?
The ones that don’t show up on a bid. These are the usual suspects:
Time. Every month the house is under construction or on the market costs interest, taxes, insurance, and utilities. See spec home carrying costs.
Your own overhead. Supervision, office, and vehicles. On a custom home your fee covers it. On a spec, charge the project for it or your “profit” is really your salary.
Selling concessions. Rate buydowns, closing cost help, or a price reduction. If the market expects them, budget them.
Final clean, touch-up, and warranty work. The house has to show well for months. Budget for repeat cleaning and small repairs.
Landscaping and curb appeal. Buyers see the yard first. A bare lot sells slower.
How does the budget connect to the pro forma?
The budget is the detail. The pro forma is the summary. The pro forma takes your budget totals, adds the projected sale price, and tells you whether the deal is worth doing and how much room you have if things go wrong.
Say your budget totals $520,000 all in and comps support a $625,000 sale. That looks like $105,000 of profit before you stress it. Now drop the price by 5% and add two months of carry. If the deal still works, you have a deal. If it doesn’t, you have a bet. The spec home pro forma article walks through that math, and our Spec Home Pro Forma Template turns it into a quick yes or no.
Keep them in sync. When the budget changes, the pro forma changes, and you should know the new profit number the same day.
How do you keep a spec house budget on track during the build?
Track it monthly, against actuals, by cost code. A budget you set at the start and look at again at closing isn’t a budget. It’s a forecast you didn’t check.
Lock the specs. No upgrades mid-build because you walked the house and got inspired. Spec builders give themselves change orders too.
Code every invoice. Every bill gets a cost code before it gets paid.
Review variance monthly. Which lines are over, which are under, and what’s still coming.
Update the forecast. Estimated cost to complete plus spent to date equals your new total. Run it through the pro forma.
Close out and compare. After the sale, compare the final numbers to the original budget. That comparison is your best estimating tool for the next one.
Once you know your real cost, setting the list price gets easier. See how to price a spec home.
Frequently asked questions
What is the biggest line in a spec home budget?
Usually hard costs, followed by land. In expensive infill markets, land can come close to hard costs, which is why the lot price drives so many spec deals.
Should a spec home budget include the builder’s overhead?
Yes. If you don’t charge the project for supervision and office costs, your profit number is overstated. Investors and lenders will want to see it too.
How is a spec home budget different from a custom home budget?
A spec budget adds the costs of carrying and selling the house, and there’s no client to absorb changes. You also make all the selections yourself, so allowances should be firm.
How often should I update my spec home budget?
At least monthly during construction, and any time a major cost changes. Update the pro forma at the same time so you always know your projected profit.
BTW, if you want a fast way to turn your spec home budget into a clear profit number for yourself, your bank, or your investors, grab our Spec Home Pro Forma Template over at the Building Optimal Shop, where you can check out the rest of our swag to build a better business. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.