New Home Maintenance Checklist: The First Year After You Build

A new home maintenance checklist for the first year covers four things: settling and warranty items, HVAC and filters, water and drainage, and seasonal exterior checks. Most of the work is small and regular, like changing filters, watching for drywall cracks, testing detectors, and keeping water moving away from the foundation. The big date is the end-of-year warranty walkthrough, so you want a written list ready before it arrives.

New houses aren’t maintenance-free. They’re drying out, settling, and getting used for the first time. Skip the basics and small items turn into real ones, and miss the warranty window and you can end up paying for something the builder would have fixed.

What should be on a new home maintenance checklist?

The short version: anything that moves water, moves air, or shows movement in the house. Here’s the core list:

  • HVAC filters: check monthly at first, since construction dust loads them fast

  • Smoke and CO detectors: test monthly, replace batteries on schedule

  • Gutters and downspouts: clear and discharging away from the house

  • Grading: soil sloping away from the foundation, especially after the first big rain

  • Caulk and grout: check tubs, showers, and countertops for gaps as the house settles

  • Drywall: note small cracks and nail pops, and save them for the warranty list

  • Doors and windows: sticking or gaps as framing dries

  • Plumbing: look under sinks and around toilets and the water heater for drips

  • Irrigation: adjust so it waters plants, not walls or the slab

First year new home maintenance, month by month

First year new home maintenance works best on a simple schedule. Here’s a sample plan, adjusted for your climate and your builder’s recommendations.

  1. Month 1: change locks and codes, find shutoffs, test detectors, register warranties, and change the HVAC filter.

  2. Month 2: walk the exterior after a rain. Look for standing water, erosion, and downspout problems.

  3. Month 3: check caulk at tubs and showers, look under sinks, and change the filter again.

  4. Months 4 to 6: service or inspect HVAC before the heavy cooling or heating season. Clean dryer vents and range hood filters.

  5. Months 7 to 9: check exterior caulk and paint, gutters, and roof from the ground. Adjust irrigation for the season.

  6. Months 10 to 11: walk every room and write down cracks, gaps, sticking doors, and anything else for the warranty list.

  7. Month 12: attend the end-of-year warranty walkthrough with your list. See the 11-month warranty inspection.

If you’re still building, it helps to start this habit before closing. Our Home Construction Checklist (Homeowner Edition) carries you from planning through closeout, so the transition into ownership isn’t a scramble.

What’s normal in new construction maintenance, and what isn’t?

In new construction maintenance, some movement is normal. Framing lumber dries and shrinks, concrete cures, and the house adjusts. Here’s a rough way to sort it, though your builder’s warranty defines what’s covered:

  • Usually normal: hairline drywall cracks, nail pops, small gaps in trim or caulk, minor door adjustments

  • Worth reporting promptly: leaks of any kind, water near the foundation, doors that stop latching, cracks that keep growing, HVAC that can’t keep up

  • Call right away: active water leaks, electrical issues like warm outlets or breakers tripping repeatedly, or gas smells

Read your warranty for what’s covered and how to submit requests. More on that in what a builder warranty covers.

New home owner maintenance checklist: seasonal tasks

A new home owner maintenance checklist also needs a seasonal layer. Use the one that fits your climate:

  • Spring: check roof and gutters, start irrigation, look at exterior caulk and paint

  • Summer: keep AC filters fresh, watch for condensation lines clogging, check for pests

  • Fall: clean gutters, service heating, check weatherstripping

  • Winter: protect hose bibs and exposed pipes where it freezes, watch for ice damming

Sample warranty list entry

Your new home maintenance checklist tells you what to look at. The warranty list records what you found. Keep one running list, on paper or your phone, and add to it the day you notice something. Each entry should be specific enough that your builder can schedule the right trade without a phone call. A sample line:

  • Item: drywall crack above primary bedroom door

  • First noticed: month 4

  • Size: about 6 inches, hairline

  • Change since: slightly longer at month 9

  • Photo: taken both months, saved with the list

That level of detail turns a vague complaint into a fixable request, and it makes the year-end walkthrough quick.

New home maintenance checklist mistakes to avoid

  • Ignoring filters. Construction dust clogs them faster than you’d expect.

  • Letting irrigation soak the foundation. Too much water near the house causes problems on many soils.

  • Waiting until month 12 to start the list. You’ll forget half of it.

  • Fixing warranty items yourself. You may void coverage. Report first.

  • Losing the paperwork. Keep manuals, warranties, and paint colors together.

If you just closed, start with our new construction move-in checklist, then run this one. For the full journey from plans to keys, see the home construction checklist for homeowners. If you want one system that keeps every phase, document, and decision organized, that’s what the Home Construction Checklist (Homeowner Edition) is for.

Frequently asked questions

How often should I change the air filter in a new house?

Check it monthly for the first few months, since construction dust loads filters quickly. After that, follow the manufacturer’s schedule and your HVAC contractor’s advice.

Is it normal for a new house to have cracks?

Small drywall and caulk cracks are common as materials dry and settle. Track them, and report any that grow or appear with other signs like sticking doors.

Do new homes need HVAC service in the first year?

Many homeowners have it checked before the first heavy season. Your equipment warranty may also list maintenance requirements, so read it.

What does a builder usually fix in the first year?

It depends on your warranty. Many cover workmanship and materials items for the first year, but the documents control, so read them and submit requests the way they say.

BTW, if you want the build, closeout, and every step into ownership organized in one place, grab our Home Construction Checklist (Homeowner Edition) over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

Previous
Previous

Visiting Your Construction Site: Etiquette and What to Look For

Next
Next

New Construction Move-In Checklist: What to Do Before Day One