A construction loan and land loan finance two different stages of the same project: the land loan pays for the lot, and the construction loan pays for building the house on it. Land loans are usually smaller, carry higher equity requirements, and fund once at closing. Construction loans fund in draws as work is completed, are short term, and are typically repaid from the sale or a permanent loan. Many builders roll the land into the construction loan when they start building.
The trouble starts when builders treat the lot purchase and the build as one decision with one financing plan, then find out the bank sees them as two. The land closes, permits take four months longer than planned, and you’re carrying a land loan you didn’t budget for while the construction lender waits on plans.
Land loan vs construction loan: what’s the difference?
The land loan vs construction loan question comes down to what the bank is lending against. A land loan is secured by dirt. A construction loan is secured by a house that doesn’t exist yet, plus the dirt under it.
Purpose. Land loan buys the lot. Construction loan pays for the build.
Funding. Land loan funds at closing. Construction loan funds in draws.
Equity. Land loans often need a bigger down payment, since raw land is harder to sell if things go wrong.
Term. Both are short. Land loans may run a year or two. Construction loans match the build plus some time to sell.
Payments. Land loans may require regular payments. Construction loans are usually interest only on what’s been drawn.
Terms vary a lot by lender and market, so confirm the details with yours.
What is a lot loan for builders?
A lot loan for builders is a land loan on a finished lot, one with utilities at the street, a plat, and approval to build. Lenders like finished lots better than raw land because the path to a house is shorter. That usually means better terms than raw land.
Many builders use a lot loan to tie up a lot while plans and permits are finished, then pay it off with the first draw of the construction loan. That works well when the timeline is tight. It hurts when permitting drags. For more on picking the right lot, see how to find lots for spec homes.
What is an acquisition and development loan?
An acquisition and development loan, usually called an A&D loan, funds buying raw land and building the infrastructure to make it buildable: roads, utilities, drainage, and lot grading. It’s the loan for the stage before vertical construction on a subdivision or larger infill project.
A&D loans are riskier for lenders than lot or construction loans, so they usually come with more equity, more scrutiny, and a stronger track record requirement. If you’re building one house on one lot, you probably don’t need one. If you’re splitting land into lots, you might. See subdividing land to build houses.
How to finance each stage of a spec project, step by step
Run the pro forma before you make an offer. Land, build, financing, and sale. If the full deal doesn’t work, the land loan doesn’t matter.
Talk to the construction lender first. Find out whether they’ll take out a land loan from another bank, or if they want to finance both.
Decide how you’ll hold the land. Cash, a land loan, a lot loan, or seller financing.
Estimate the gap. Months between land closing and construction start. Price the interest and taxes for that time.
Close on the land. With a contingency for permits or feasibility if you can get one.
Get plans, permits, and budget to the construction lender. They need all three to approve the loan.
Close the construction loan. Pay off the land loan, credit your equity in the land, and start draws.
The step that saves the most pain is the first one. Our Spec Home Pro Forma Template gives you a quick yes or no on the deal, including financing costs, before you put earnest money on a lot.
Example: land loan rolled into a construction loan
A hypothetical deal, round numbers:
Lot price: $200,000
Land loan: $130,000, with $70,000 cash down
Months held before construction: 5
Land carry (interest, taxes, insurance): roughly $6,000 in this example
Construction loan closes: $650,000 total, of which $130,000 pays off the land loan
Equity credited for land: the $70,000 cash down, if the lender accepts it
The $6,000 in land carry is real money that a lot of first pro formas miss. If permits take nine months instead of five, that number keeps climbing. For more on these costs, see spec home carrying costs.
Should you get a construction loan and land loan separately or together?
One loan is simpler if the lender will do it and your timeline is short. Two loans give you flexibility to buy a lot before plans are ready, but you pay closing costs twice and take on refinance risk.
A short checklist to decide:
Plans ready? If plans and permits are close, one loan is often easier.
Need to move fast on the lot? A separate land loan or cash may be your only option.
Lender relationship? A lender who knows you may finance both.
Equity available? Two loans can mean two equity checks.
Exit plan? Know how the construction loan gets paid off before you close on the land.
Common mistakes financing land and construction
Buying the lot before checking the construction loan. Then finding out the lender won’t do the house you planned.
Ignoring land carry. Every month before the start costs money.
Assuming land equity transfers at full value. Ask how your lender credits it.
No permit contingency. A delay you can’t control eats your profit.
The more stages a deal has, the more important it is that all the numbers live in one place. A consistent Spec Home Pro Forma Template keeps land, construction, and financing costs on the same page, so the construction loan and land loan plan matches the deal you actually signed. For the build side, read about spec construction loans.
Frequently asked questions
Can I use one loan to buy land and build a house?
Yes, many lenders offer combined land and construction financing. Terms, equity requirements, and timing vary, so ask your lender.
Is a land loan harder to get than a construction loan?
Raw land loans can be harder, with higher down payments, because land is less liquid. Finished lots are usually easier.
Does land I own count toward my construction loan equity?
Often, yes. How much credit you get depends on the lender, the appraisal, and how long you’ve owned it.
How long can I hold land before building?
As long as you can afford the carry and your loan term allows. Watch the maturity date on any land loan.
BTW, if you want the land, the build, and the financing in one set of numbers before you make an offer, grab our Spec Home Pro Forma Template over at the Building Optimal Shop, where you can check out the rest of our swag to build a better business. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.