Construction Insurance for Building a House: What You Need

Construction insurance for building a house usually comes down to three questions: who carries builder’s risk on the structure while it’s being built, what liability coverage protects you as the property owner, and when your regular homeowners policy starts. In many custom builds the builder carries builder’s risk and liability, and the homeowner adds or confirms owner coverage and lines up a homeowners policy to start at completion. Who carries what depends on your contract and your lender, so confirm it with both and with your insurance agent.

Insurance is the part of a build nobody wants to read about until something happens. A storm, a theft of materials, or someone getting hurt on site is when you find out whether the paperwork was right. Getting it straight up front costs an hour. Getting it wrong can cost the house.

Construction insurance for building a house: what do you need?

The common pieces, in plain terms. Coverage names and details vary by insurer and state.

  • Builder’s risk: covers the structure and materials during construction against things like fire, wind, theft, and vandalism, subject to the policy.

  • General liability: covers injuries or damage to others caused by the work. Builders and subcontractors carry their own.

  • Workers’ compensation: covers injured workers. Requirements vary by state.

  • Owner’s liability: protects you as the landowner if someone is hurt on your property.

  • Homeowners insurance: takes over when the house is complete and occupied.

  • Flood or other special coverage: if your lot or lender requires it.

Does the homeowner need builders risk insurance?

Sometimes. The builders risk insurance homeowner question comes down to who your contract says carries it. Many builders include it. Some contracts require the owner to buy it. If you’re acting as your own general contractor, you’ll almost certainly be responsible for it. See being an owner builder.

Questions to answer in writing:

  • Who is the named insured on the builder’s risk policy?

  • Are you listed on it, and is your lender?

  • What does it cover, and what are the deductibles?

  • When does it start and end? Gaps between builder’s risk ending and homeowners starting are common.

  • What’s excluded? Flood, earthquake, and certain theft situations are common exclusions. Your agent can explain yours.

Step by step: setting up construction insurance for homeowners

Construction insurance for homeowners goes smoother if you handle it in this order:

  1. Read your contract’s insurance section. It should say who carries what.

  2. Ask your lender for their requirements. Most construction lenders have specific coverage and naming requirements.

  3. Get certificates of insurance from your builder. Ask for builder’s risk, general liability, and workers’ comp. See certificates of insurance in construction.

  4. Talk to your own insurance agent. Explain the project and ask what you need as the owner.

  5. Fill any gaps. Owner’s liability, flood, or an owner-purchased builder’s risk policy if the contract requires it.

  6. Line up homeowners insurance. Set it to start when the house is complete, before closing or move-in.

  7. Keep the documents together. Policies, certificates, and contacts in one place.

Insurance is one of a dozen pre-construction items that are easy to skip. Our Home Construction Checklist (Homeowner Edition) keeps it on the list with everything else that needs to be done before work starts.

When does new construction home insurance start?

New construction home insurance, meaning your regular homeowners policy, typically starts when the house is complete and ready for occupancy, often at closing on a construction-to-permanent loan or at move-in. The tricky part is the handoff. If the builder’s risk policy ends at substantial completion and your homeowners policy doesn’t start until closing, there can be a gap. Ask your agent to line up the dates.

Example: who covers what

A hypothetical custom build where the builder carries builder’s risk:

  • Windstorm damages framing mid-build: likely a builder’s risk claim, subject to the policy and deductible.

  • Materials stolen from the site: may be covered by builder’s risk, depending on the policy’s theft terms.

  • A trade worker is injured: that trade’s workers’ comp, if they carry it as required.

  • A neighbor’s fence is damaged by equipment: the responsible contractor’s general liability.

  • Someone trespasses and is hurt: could involve owner’s liability. Ask your agent.

Every policy is different, so this is a way of thinking about it, not a coverage opinion. Your agent and the policy wording decide.

Checklist: construction insurance for building a house

Run through this before the first shovel hits the dirt, and again before closing. It takes a few emails and one call with your agent.

  • Contract reviewed for insurance responsibilities

  • Lender requirements in writing

  • Builder’s certificates for builder’s risk, general liability, and workers’ comp on file

  • Your name and lender listed where required

  • Owner coverage confirmed with your agent

  • Flood or special coverage if your lot needs it

  • Homeowners policy lined up to start without a gap

  • Claim process understood: who you call first

When you interview builders, ask about insurance up front. See questions to ask a home builder. And after move-in, know what’s covered by your builder warranty versus your insurance. To keep policies, certificates, and dates in one system through the build, use the Home Construction Checklist (Homeowner Edition).

Frequently asked questions

Is builder’s risk insurance required by lenders?

Many construction lenders require it, along with specific naming terms. Ask your lender for their exact requirements.

Does homeowners insurance cover a house under construction?

A standard homeowners policy often isn’t designed for a house under construction. Ask your agent what applies during the build and when your homeowners policy can start.

How much does builder’s risk insurance cost?

It varies with the project’s value, location, construction type, and coverage. Your agent or builder can get a quote for your specific build.

What if my builder doesn’t carry insurance?

That’s a serious red flag. Ask for certificates before you sign, and talk to your agent and attorney about the risk if they can’t provide them.

BTW, if you want insurance, lender, and builder paperwork tracked in one place through the build, grab our Home Construction Checklist (Homeowner Edition) over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

Previous
Previous

On-Your-Lot Home Builders: How They Work and What to Ask

Next
Next

How a Construction Loan Appraisal Works Before the House Exists