Buying Land to Build a House: A Checklist Before You Close

Buying land to build a house comes down to one question: can you build the house you want on this lot, for a cost you can afford? Before you close, check zoning and deed restrictions, setbacks and easements, flood zone, access, utilities, soil and septic suitability, and the survey. Then get a builder to look at the lot. A cheap lot with expensive problems is not a cheap lot.

I get calls from people who already bought the land and want to know what it’ll cost to build. I’d much rather get the call a month earlier, while they still have a contingency period and some leverage.

What should you check before buying land?

What to check before buying land falls into four groups: legal, physical, utilities, and cost. Here’s the short version, then the detail.

  • Legal: zoning, deed restrictions, HOA rules, easements, setbacks, and title

  • Physical: topography, soil, trees, drainage, and flood zone

  • Utilities: power, water, sewer or septic, and internet

  • Cost: site work, utility extensions, fees, and the house itself

Is it a buildable lot? The legal questions

A buildable lot is one where the rules allow the house you want. Check these before you get attached:

  1. Zoning. Does it allow a single-family home? Any minimum or maximum size rules?

  2. Deed restrictions and HOA rules. Many subdivisions control house size, materials, roof pitch, fencing, and even builders. Get the documents and read them.

  3. Setbacks. How far from each property line the house has to be. On narrow lots, setbacks decide the house width.

  4. Easements. Utility, drainage, or access easements can block building in part of the lot.

  5. Title. A title search and title insurance protect you from ownership problems. Your title company or real estate attorney handles this.

  6. Access. Legal access from a public road. Landlocked parcels or shared driveways need extra attention.

Rules vary by city, county, and subdivision. Confirm with the planning department and a real estate attorney.

What physical conditions should you check?

The physical conditions of the land drive a big part of your site costs. Look at:

  • Slope. Steep lots can need taller foundations, retaining walls, or special engineering.

  • Soil. Expansive clay, rock, or fill can affect foundation design. A soils report helps.

  • Septic suitability. If there’s no sewer, get a perc test before you close.

  • Flood zone and drainage. Floodplain status affects where and how you can build, and your insurance. Watch the lot after heavy rain if you can.

  • Trees. Great to keep, expensive to remove, and protected in some cities.

  • Previous use. Old structures, buried debris, or environmental concerns.

A boundary and topographic survey answer a lot of these questions. See land survey before building.

What utilities does the lot have?

Find out exactly what’s available and how far away it is. This can be the biggest cost difference between two lots at the same price.

  • Electricity: nearest service, provider, and extension cost

  • Water: public or co-op tap, or a private well

  • Wastewater: sewer connection or septic system

  • Internet: what providers actually serve the address

  • Gas: natural gas line or propane

Our guide to bringing utilities to raw land explains each one.

How do you estimate the total cost before buying?

Add the land price to the site costs and the house, and see if the total still works. Say you’re comparing two lots. Lot A is priced higher but has utilities at the road, a flat building pad, and city sewer. Lot B is cheaper but needs clearing, a long driveway, an electrical extension, a well, and a septic system. Lot B might cost more by the time you move in.

Ask a builder to walk the lot with you and give you a rough site cost estimate. Many builders will do this for a serious client. Our article on the cost to build on your own land lists the categories to include.

If you want every one of these checks in order along with the rest of the build, our Home Construction Checklist (Homeowner Edition) lays it out step by step.

Buying land to build a house: a lot buying checklist before you close

  • Get zoning, deed restrictions, and HOA documents and read them

  • Confirm setbacks, easements, and legal access

  • Order a boundary survey and, if possible, a topographic survey

  • Check flood zone status and talk to an insurance agent

  • Get a soil test and perc test if septic is needed

  • Confirm every utility and its cost to connect

  • Have a builder walk the lot and estimate site costs

  • Talk to a lender about land and construction financing

  • Order title work and review it with your title company or attorney

  • Negotiate a due diligence or contingency period long enough to do all of this

That last item makes the rest possible. Ask your real estate attorney how to structure it.

Frequently asked questions

Should I hire a builder before buying land?

It helps. A builder can spot site costs and design limits you might miss, and give you a realistic total before you commit.

What makes a lot unbuildable?

Common reasons include zoning that doesn’t allow a home, no legal access, soil that can’t support a septic system, or restrictions like floodplain rules. Check each before closing.

Can I get a loan to buy land?

Often, yes, though land loans can have different terms than home mortgages. Some construction loans can include the land purchase. Talk to a lender early.

How long should my due diligence period be?

Long enough to get surveys, soil tests, utility answers, and a builder’s estimate. Ask your attorney and agent what’s typical in your area.

BTW, if you want the land checks and every step after them in one organized list, grab our Home Construction Checklist (Homeowner Edition) over at the Building Optimal Shop. Proceeds go to benefit, Exponencialistas, my non-profit investing in entrepreneurs transforming their communities in Latin America.

Previous
Previous

Custom Home vs. Production Home: Which Is Right for You?

Next
Next

The Building Permit Process for a New Home